bex+Co. Development Command Center · v4 exploration

Three directions for the Overview screen.

Pick one. Each concept is a different structural answer to the same problem: v3 leads with a 504-cell matrix for 17 working deals, and four tiles that count inventory instead of answering “are we on track.” Every number on this page is computed from the real 25-location snapshot.

Concepts for review · mockups only, no live system behind them Underlying statuses are draft data, pending Kirsten's confirmation Snapshot Tue 11 Aug 2026 · 25 locations · 17 working

What these concepts are arguing with

From the v4 analysis. The three failures below are what each concept attacks from a different angle.

95%
The matrix is empty

14 status rows × 36 months = 504 cells for 17 deals. The lowest-density object on the page is the first thing you see.

4
Tiles that count, not answer

Open, working, targeting, forecast total. Every one is a population count. None survives the question “and is that good?”

25
Statuses flagged Draft

A package-prep deal and a store in construction are counted identically, then the unweighted total gets quoted in a board meeting.

Concept A

The Answer

One number owns the screen. Everything else is one tap down.

Radically reductive. The Overview stops being a report and becomes a verdict: 11 of 16 stores likely to open in the next twelve months, with 5 stores of exposure between the plan and the forecast. Built for a CEO who opens this on a phone between meetings and needs the answer before the elevator doors close.

pipeline.bexandcofranchise.com / overviewMockup

Laptop view at full scale. Swipe sideways to pan.

bex+Co. Rolling 12 months · through Jul 2027
11
of 16 targeted
stores likely to open

Confidence-weighted against the 16 deals whose target period falls inside the window. 5 stores of exposure between the plan and the forecast.

Weighted 11.0Plan 16
Construction 0.95Permitting 1.70Lease 3.00Committee 5.40Gap 5.00

Weights are planning assumptions, tunable in one config, not a prediction the system computed. Construction 95% · Permitting 85% · Lease 75% · Committee 60%. All 25 statuses are Draft.

375 px
bex+Co. Rolling 12 months · through Jul 2027
11
of 16 targeted
stores likely to open

Confidence-weighted against the 16 deals whose target period falls inside the window. 5 stores of exposure between the plan and the forecast.

Weighted 11.0Plan 16
Construction 0.95Permitting 1.70Lease 3.00Committee 5.40Gap 5.00

Weights are planning assumptions, tunable in one config, not a prediction the system computed. Construction 95% · Permitting 85% · Lease 75% · Committee 60%. All 25 statuses are Draft.

Best when

Gary glancing at a phone. Board slides. The two-second “are we on track” check. It is the only concept that survives being read at arm’s length.

Worst when

The biweekly working session. It hides every detail Kirsten needs, and it stakes the whole screen on weights nobody has ratified yet. Get the weights wrong and the headline is confidently wrong.

Concept B

The Timeline

Kill the matrix. Put the deals on a time ribbon and let the clustering speak.

Quarters across, each deal a chip sitting in its target month, coloured by stage, stacked where they collide. The 504-cell matrix becomes five columns of real ink. Immediately visible and invisible in v3: three empty months, then 10 openings in Q1 2027 and 5 in April alone. A moved date leaves a ghost marker behind it.

pipeline.bexandcofranchise.com / overviewMockup

Laptop view at full scale. Swipe sideways to pan.

bex+Co. Opening ribbon
CommitteeLeasePermittingConstructionAt Risk
Q3 2026Jul – Sep
0openings

Nothing targeted

Q4 2026Oct – Dec
1opening
Nov ’261
Liberty Hill 48-009 · T CON CP Aug ’26Nov ’26moved once
Q1 2027Jan – Mar
10openings
Jan ’272
Charlotte South 37-001 · PERMITS
Dallas North – McKinney & Frisco 48-012 · PERMITS
Feb ’274
Tucson 04-001 · DOC PDG
Omaha 31-001 · DOC PREP
Nashville 47-001 · DOC PREP
Plano / Allen 48-014 · DOC PDG
Mar ’274
Scottsdale 04-002 · PKG PREP
San Antonio Northwest 48-010 · PKG PREP
San Antonio Northeast 48-011 · PKG PREP
Salt Lake City 49-001 · PKG PREP
Q2 2027Apr – Jun
6openings
Apr ’275
Atlanta – Marietta / Vinings 13-001 · PKG PREP
Winston-Salem 37-003 · PKG PREP
Houston West – Sugar Land / Katy 48-013 · PKG PREP
Dallas Mid-Cities – Southlake 48-015 · PKG PREP
North Houston – The Woodlands 48-016 · PKG PREP
Jun ’271
Charlotte – Location #2 37-002 · DEFERRED
Q3 2027Jul – Sep
0openings

Nothing targeted

Read the shape. Three empty months, then 10 openings land in Q1 2027 and 5 in April alone. The ghost marker on Liberty Hill shows the mechanic for a moved date. It is illustrative only: no slippage history exists yet, and the baseline starts at the first v4 snapshot.

375 px
bex+Co. Opening ribbon
CommitteeLeasePermittingConstructionAt Risk
Q3 2026Jul – Sep
0openings

Nothing targeted

Q4 2026Oct – Dec
1opening
Nov ’261
Liberty Hill 48-009 · T CON CP Aug ’26Nov ’26moved once
Q1 2027Jan – Mar
10openings
Jan ’272
Charlotte South 37-001 · PERMITS
Dallas North – McKinney & Frisco 48-012 · PERMITS
Feb ’274
Tucson 04-001 · DOC PDG
Omaha 31-001 · DOC PREP
Nashville 47-001 · DOC PREP
Plano / Allen 48-014 · DOC PDG
Mar ’274
Scottsdale 04-002 · PKG PREP
San Antonio Northwest 48-010 · PKG PREP
San Antonio Northeast 48-011 · PKG PREP
Salt Lake City 49-001 · PKG PREP
Q2 2027Apr – Jun
6openings
Apr ’275
Atlanta – Marietta / Vinings 13-001 · PKG PREP
Winston-Salem 37-003 · PKG PREP
Houston West – Sugar Land / Katy 48-013 · PKG PREP
Dallas Mid-Cities – Southlake 48-015 · PKG PREP
North Houston – The Woodlands 48-016 · PKG PREP
Jun ’271
Charlotte – Location #2 37-002 · DEFERRED
Q3 2027Jul – Sep
0openings

Nothing targeted

Read the shape. Three empty months, then 10 openings land in Q1 2027 and 5 in April alone. The ghost marker on Liberty Hill shows the mechanic for a moved date. It is illustrative only: no slippage history exists yet, and the baseline starts at the first v4 snapshot.

Best when

Capacity and sequencing conversations. Construction scheduling. Anywhere the question is “can we absorb that” rather than “how many”.

Worst when

A phone at a glance. It asks for a second of reading, and Gary may not give it one. It also inherits the honesty problem: every target period is Draft, so the clustering it reveals is only as real as Kirsten’s confirmation.

Concept C

The Funnel

Change the question from when deals open to where they stall.

Reframes from time to flow. Volume at each step, Committee 9 into Lease 4 into Permitting 2 into Construction 1, with ageing beside each bar and a stall list on the right. The ageing ladder is real and it climbs cleanly: 26d, 89d, 148d, 286d. It answers the one question the other two cannot.

pipeline.bexandcofranchise.com / overviewMockup

Laptop view at full scale. Swipe sideways to pan.

bex+Co. Where deals sit

Stage funnel standing volume, 17 working deals

Committee
9
26median days4 without a start date
9 → 4
Lease
4
89median days
4 → 2
Permitting
2
148median days
2 → 1
Construction
1
286median days
8 OpenAll corporate, all in Austin. These predate the franchise funnel, so they sit outside it.
Stage-to-stage conversion Unlocks at the second snapshot. Rates need history, and the first snapshot is today. No fabricated change log.

Stall list oldest first

  • Liberty Hill Tenant Construction · target Nov ’26 286days
  • Charlotte South Permits · target Jan ’27 148days
  • Dallas North – McKinney & Frisco Permits · target Jan ’27 148days
  • Tucson Documents Pending · target Feb ’27 117days
  • Nashville Lease Preparation · target Feb ’27 109days
5 deals have no clock running No onboarding start captured, so nothing is ageing. Kirsten's first worklist.
  • Scottsdale04-002
  • Charlotte – Location #237-002
  • San Antonio Northwest48-010
  • San Antonio Northeast48-011
  • Houston West – Sugar Land / Katy48-013

Honest caveat. Age is measured from Onboarding Start Date, the only real date on these records. True days-in-stage starts accruing at the first v4 snapshot.

375 px
bex+Co. Where deals sit

Stage funnel standing volume, 17 working deals

Committee
9
26median days4 without a start date
9 → 4
Lease
4
89median days
4 → 2
Permitting
2
148median days
2 → 1
Construction
1
286median days
8 OpenAll corporate, all in Austin. These predate the franchise funnel, so they sit outside it.
Stage-to-stage conversion Unlocks at the second snapshot. Rates need history, and the first snapshot is today. No fabricated change log.

Stall list oldest first

  • Liberty Hill Tenant Construction · target Nov ’26 286days
  • Charlotte South Permits · target Jan ’27 148days
  • Dallas North – McKinney & Frisco Permits · target Jan ’27 148days
  • Tucson Documents Pending · target Feb ’27 117days
  • Nashville Lease Preparation · target Feb ’27 109days
5 deals have no clock running No onboarding start captured, so nothing is ageing. Kirsten's first worklist.
  • Scottsdale04-002
  • Charlotte – Location #237-002
  • San Antonio Northwest48-010
  • San Antonio Northeast48-011
  • Houston West – Sugar Land / Katy48-013

Honest caveat. Age is measured from Onboarding Start Date, the only real date on these records. True days-in-stage starts accruing at the first v4 snapshot.

Best when

Kirsten’s worklist and the coach call. It is the only concept that produces a to-do rather than a status, and the “5 deals with no clock running” panel is worth the build on its own.

Worst when

Today, honestly. Half of it is a promise. Conversion rates need two snapshots and the first is today, and the ageing runs on Onboarding Start Date as a proxy because true days-in-stage does not exist yet. This concept is strongest ninety days from now.

The pick

Ship A as the hero, B underneath it, C as its own view.

If forced to one, I take B, The Timeline. It surfaces something nobody currently knows: 10 of 17 deals land in a single quarter and 5 in a single month. That is a capacity problem hiding inside a status report, and no grid was ever going to show it. The three answer three different questions though, and the Overview has room for two of them.

Block 1 · above the fold
A · The Answer

The weighted hero, roughly a third of the screen. Gary gets the verdict without scrolling, and the phone version is the whole first screen.

Block 2 · scroll one
B · The Timeline

Replaces the matrix outright. The quarter ribbon becomes the working surface for the biweekly call, with months available on demand.

Its own view
C · The Funnel

Kirsten's worklist. It deserves a nav item beside Real Estate, where a stall list has room to breathe.

Reasoning, and what I would watch

  • A alone is too thin. One number is perfect for the phone and thin for the working session. It also puts the entire headline on stage weights nobody has ratified. Ship it with the weights visible on screen, as drawn here, or it becomes a number people argue with rather than act on.
  • B is the biggest information gain per pixel. Same data as the matrix, roughly ten times the ink per cell, fits a phone without sideways scrolling, and the empty quarters carry as much meaning as the full ones. The slippage ghost is the piece worth building properly, because a date that keeps moving is the strongest signal in development.
  • C came out weaker than the brief hoped, and the cause is the data. Conversion between stages cannot be drawn today, because rates need two snapshots and the first one is today. Ageing runs on Onboarding Start Date as a proxy, since true days-in-stage does not exist yet, and 5 deals have no start date at all. What C does deliver today is the stall list and the no-clock panel, and both are genuinely useful. Ninety days of snapshots turn it into the strongest of the three.
  • The counts are real, the dates are not confirmed. Committee 9, Lease 4, Permitting 2, Construction 1, Open 8, At Risk 1. All 25 statuses carry Draft confidence. Whichever direction wins, the clustering, the gap, and the stall list all move once Kirsten confirms.